Serious upgrades are in the works along the tracks from Haverhill, Massachusetts, all the way up to Brunswick, Maine. Amtrak is dropping over $50 million to install Positive Train Control (PTC), a high-tech system that'll automatically keep trains in check and make trips faster and safer.
I’ve given my kids a lot of good memories, I hope. One thing left I really want to do with them before they get too much older is take them on the Downeaster.
Success always seems to come with some problems, and in Brunswick, the noise from the idling train is a concern. The good news is that ridership for the Amtrak Downeaster’s first month of passenger service to Freeport and Brunswick was higher than expected. 80% higher that expected!